512 results:
201. KPO reports half year performance results  
…AKSAI, Western Kazakhstan Oblast, 19 August, 2013 - Karachaganak Petroleum Operating B.V. (KPO) has announced half year performance results.  
202. Addressing Community Water Needs in the Philippines  
…Uralsk, Western Kazakhstan Oblast, 4 December 2012 – Karachaganak Petroleum Operating B.V. (KPO) has announced that the new Secondary School #37 for 1,200 pupils has successfully opened its doors. It was built by the…  
203. KPO hosts OPITO graduation ceremony  
…AKSAI, Western Kazakhstan Oblast, 30 September, 2013 - Karachaganak Petroleum Operating B.V. (KPO) announced today that 32 young graduates successfully completed the programme for Production and Maintenance Engineers…  
204. KPO held public hearings on 2014 environment protective measures plan  
…Uralsk, Western Kazakhstan Oblast, 4 December 2012 – Karachaganak Petroleum Operating B.V. (KPO) has announced that the new Secondary School #37 for 1,200 pupils has successfully opened its doors. It was built by the…  
205. KPO Receives Innovative Stand Design Award at KIOGE 2013  
…Almaty, 4 October, 2013 - Karachaganak Petroleum Operating B.V. (KPO) received the Innovative Stand Design Award at KIOGE 2013, the largest oil and gas exhibition and conference in the Caspian region, which was held in…  
206. Addressing Community Water Needs in the Philippines  
…Uralsk, Western Kazakhstan Oblast, 4 December 2012 – Karachaganak Petroleum Operating B.V. (KPO) has announced that the new Secondary School #37 for 1,200 pupils has successfully opened its doors. It was built by the…  
207. First Group of Students Complete 'International Welding Engineer' Programme  
… an ‘International Welding Engineer’ course, which has been arranged thanks to support of Karachaganak Petroleum Operating B.V., North Caspian Operating Company and Tengizchevroil. This training programme is…  
208. Petroleum Production Technology Engineer  
Project Development  
209. KPO COMPLETES NEW SCHOOL IN WKO  
…AKSAI, Western Kazakhstan Oblast, 12 December 2013 – Karachaganak Petroleum Operating B.V. (KPO) has announced that a new secondary school for 198 pupils built by the company as part of the state programme “100 schools,…  
210. Addressing Community Water Needs in the Philippines  
…Uralsk, Western Kazakhstan Oblast, 4 December 2012 – Karachaganak Petroleum Operating B.V. (KPO) has announced that the new Secondary School #37 for 1,200 pupils has successfully opened its doors. It was built by the…  
Search results 201 until 210 of 512