2878 results:
1531. Refurbishment of State Enterprise with the right of economic jurisdiction «Burlin Central District Hospital of the Health Department WKO»  
2015 Refurbishment of State Enterprise with the right of economic jurisdiction «Burlin Central District Hospital of the Health Department WKO» (phase 1) (implementation of phase 2 is on…  
1532. Reconstruction of water supply system in Kanay village of Burlin district, WKO  
2015 Reconstruction of water supply system in Kanay village of Burlin district, WKO  Performed by:  "KazConstructionGroup" LLP Budget: 840 000$  
1533. Construction and upgrading of motor roads in Uralsk  
2011-2012  Construction and upgrading of motor roads in Uralsk  Performed by «Aksai zhelezo-beton» LLP  Budget: 1 300 000$  
1534. Reconstruction of water supply system in Beryozovka village of Burlin District  
2011  Reconstruction of water supply system in Beryozovka village of Burlin District  Performed by “Spetstroyservice” LLP Budget: 2 000 000 $  
1535. Construction of Cultural Centre in Sary Omir village of Terekta District  
2011-2012  Construction of Cultural Centre in Sary Omir village of  Terekta District Performed by: «Bolashak-T» LLP   Budget: 2 190 000$  
1536. Construction of Music School in Zhympity village of Syrym District  
2011-2012  Construction of Music School in Zhympity village of Syrym District Performed by: «Altair» LLP       Budget: 560 000$  
1537. Preparation of the design and engineering requirement for Football Arena for 3000 spectators in Uralsk  
2013  Preparation of the design and engineering requirement for Football Arena for 3000 spectators in Uralsk Performed by «Kulman» LLP Budget: 270 000$  
1538. Preparation of the design and engineering requirement for Library in Uralsk  
2013  Preparation of the design and engineering requirement for Library in Uralsk Performed by: LLP «Gaspromproject» Budget: 500 000$  
1539. Карачаганак: местное содержание в кадрах в приоритете  
АКСАЙ, Западно-Казахстанская область, 15 января 2016 г. — «Карачаганак Петролиум Оперейтинг Б.В.» (КПО) провела в г. Аксай разъяснительный семинар для представителей…  
1540. Karachaganak: increasing local content in staff is a priority  
AKSAI, West Kazakhstan Oblast, 15 January 2016 — Karachaganak Petroleum Operating B.V. (KPO) held a clarification workshop in Aksai for the representatives…  
Search results 1531 until 1540 of 2878