2878 results:
62. Monitoring of flora and fauna  
Monitoring of flora The next stage of flora monitoring was carried out in the spring and summer periods of 2022 at 27 monitoring sites. , and a comparative analysis…  
63. Biodiversity Action Plan  
2011-2023 Biodiversity Action Plan implementation Since 2011, KPO have been implementing activities in compliance with the Biodiversity Action Plan as shown in the table…  
64. HSE Card programme  
HSE Card programme GRI 2-23, 3-3, 403-2, 403-4, SDG 8.8 In August 2022, the «Intervention» campaign was launched under the HSE Card program. The main purpose of the campaign was…  
65. KPO Banking Details (copy 1)  
KPO B.V. Banking Details IN KZT Company Name: Karachaganak Petroleum Operating B.V., Kazakhstan Branch TRN: 270300007850 BIN: 981141001567 Kbe: 27 Bank: JSC “Halyk Bank of Kazakhstan” …  
67. E-Procurement (E-Bidding)  
E-Procurement (E-Bidding) E-Procurement (E-Bidding) E-Bidding. Introduction to Training Manuals KPO b.v. Technical requirements  
68. Programme for increasing local content in staff  
Programme for increasing local content in staff Development of the national personnel is a continuous process in KPO. Professional competency is maintained and developed…  
69. Personnel training and development  
Personnel training and development For the safe and efficient operations of the Karachaganak field facilities, we always need the highly qualified personnel. KPO applies worldwide…  
70. Competency Management System  
Сase study CASE STUDY: COMPETENCE ASSESSMENT OF INDUSTRIAL SUPERVISORS AND ENGINEERING PERSONNEL IN THE FIELD DEPARTMENT Context / …  
Search results 61 until 70 of 2878